Have the ability to receive multiple items on 1 pallet and have the pallet charge as 1 pallet.
scenario is
UOM for the items A, B, and C is 100 each = 1 Pallet.
PO is for Item A x 140, Item B x 120 Item C x 130.
We receive 3 full pallets of 100 then I would need to build the part portions on 1 pallet as per customer requirement.
Item A is for 40 - Item B is for 20 - Item C is for30 = 1 Pallet.
This would require a pallet build function for the 3 items and a setting to allocate Product Type, so the charging is for 1 Pallet.